beautypg.com

5 putting into operation, 1 installation, Putting into operation 5.1 – BUCHI Vacuum Controller V-855 User Manual

Page 20: 5putting into operation

background image

5 Putting into operation

20

V-850/855 Operation Manual, Version E

5

Putting into operation

This chapter describes how the instrument is installed and gives instructions on initial startup.

NOTE:
Inspect the instrument for damages during unpacking. If necessary, prepare a status report immedi-
ately to inform the postal company, railway company or transportation company.

Keep the original packaging for future transport.

5 .1

Setting up the Rotavapor with the Vacuum Controller V-850/855

5 .1 .1

Installation

3

2

1

To install the vacuum controller to the Rotavapor,
proceed as follows:
• Screw the holder a for the vacuum controller

to the top of the Rotavapor.

• Slide the guide rail b of the vacuum controller

over the holder.

• Fix the vacuum controller to the holder by

tightening the knurled nut c.

This manual is related to the following products: