Line data input (when line length is known), When line length is known, Line data input – Daiwa TANACOM BULL 500 User Manual
Page 13: When line length is known)
11
Line data input
(When line length is known)
This method is used when the line length is known before winding. In the example below,
PE 6 – 280m is wound.
1.
Run line through the levelwind guide and tie it onto the spool.
The levelwind threader makes this process easier. Make sure to
tie the line onto the pin found on the spool to avoid the line
slipping.
8.
Push the power lever forward to maximum and wind the line to
its end.
As the power lever is moved forward, the
P2
display changes
to a tension indicator. Keep line tension between level 3 and 4
while winding on line.
2.
Move the power lever to the OFF position.
6.
When the button is released, the display will then change to the
figure on the left, which shows
P1
.
1
5
7
6
8
Levelwind Guide
Main line
Pin
Power lever
2
Tension indicatar
7.
Press
MODE SETTING BUTTON
once to move to the line
length input mode.
P2
will be blinking.
3.
Connect the clip to the power source (12V DC).
4.
Attach the cord connector to the reel.
See in page 2 for the connection method.
5.
Press the
MODE SETTING BUTTON
and hold for five seconds,
until the display shows
0.0
.
-Do not allow line to rub against the finger guard while
winding as it will scratch the guard.