beautypg.com

Blower testing – Bradford White TW4-75S-76B-3X User Manual

Page 20

background image

TTW SERVICE PROCEDURE IV

Blower Testing and Replacement

WARNING

115 volt potential exposure. Use caution when

making voltage checks to avoid personal injury.

Blower Testing

Is there 115VAC

across terminals

shown in photo 12 ?

Incorrect supply

voltage polarity

Determine

power source

problem and

correct.

Does blower energize

Within 2 minutes?

Y

Disconnect cord set

shown in photo 9. Is

there 115VAC across

terminals shown in

photo 11

N

See pressure

switch testing

Page 18

Is there 115 VAC

at wall outlet?

Check power cord

for damage.

Y

N

Disconnect

pressure switch

tubing from blower.

(see photo 8)

Connect

manometer to

pressure tap of

blower.

(see photo 8)

With blower running, and exhaust

adapter removed from top of

blower, is there a negative

pressure of -2.15" to -2.30" W.C.?

Step 1.

Position gas control power switch

to “ON” position and adjust control to call for heat.

Step 2.

Remove the three screws (Phillips Screw driver)

from control access cover on blower assembly and

remove cover (see photo 7).

Reconnect cord set

shown in photo 9, is

there 115VAC between

blue wire and green

ground wire

(see photo 13)

Replace blower

Does cord set

have electrical

continuity?

Disconnect vent

system from top of

blower and remove

vent adapter.

(see photo 10)

Does blower energize after

2 minutes, run for 30

seconds and shut down?

N

Is there 115vac across

blue and green wires

(see photo 13)

Blower OK

Y

Repair or replace

power cord

Replace blower

Y

N

N

N

N

Y

Y

Y

Y

N

Pressure

switch tubing

Pressure tap

Remove exhaust

adapter

Shown with pressure

switch removed.

Green ground

wire

Blue wire

Replace blower

Y

Determine voltage

problem and correct.

N

Page 20

7

8

9

11

12

13

10

Replace

gas control

Y

Replace

cord set

N

pg20.pdf 1

pg20.pdf 1

3/24/06 4:05:46 PM

3/24/06 4:05:46 PM

Page 20