beautypg.com

Decommisioning, Chapter 8 decommisioning – B&C Technologies SP Series Commercial User Manual

Page 60

background image

Chapter 8

Decommisioning

In the event that the machine must be decommissioned, follow these steps:

1. Clean interior of machine, both basket and shell.

2. Disconnect electrical power.

(a) Shut of main power supply at the breaker box or main control panel.

(b) Do not attempt to disconnect power supply wires from power supply. Have a qualified

electrician disconnect power to machine at its source.

3. Disconnect gas/steam supply.

4. Disconnect exhaust system.

5. Remove the machine from its foundation pad.

(a) Keep all panels in place to provide stability when moving the machine.

(b) Verify that door is closed and secure

(c) Place the machine on skid and bolt the frame to the skid. This will facilitate the removal

of the machine on to a truck.

6. Recycle.

The manufacturer uses the highest quality material in their products so that those material may be
recycled at the end of the product’s service life.

56