beautypg.com

Connect the blood pressure (nibp) hose – Welch Allyn Connex Integrated Wall System Start Up Guide - Installation Guide User Manual

Page 16

background image

12

Setup

Welch Allyn Connex® Integrated Wall System

4.

Wrap the excess SpO2 patient cable around the spool, and place the SpO2 finger clip
in the SpO2 holder.

Connect the blood pressure (NIBP) hose

1.

Align the hose connector with the hose connector port on the bottom of the monitor.

2.

Insert the hose connector, pressing firmly until it clicks into place.

3.

Attach a blood pressure cuff to the tubing (see the cuff manufacturer's directions for
use), then store the cuff in the accessory bin.