Welch Allyn Mach 6 Quick Reference Guide - Quick Reference Guide User Manual
Mach 6 quick reference guide, Maintenance checks
MACH 6 Quick Reference Guide
K990291 Rev. C
Daily Requirements
Powder Canister Level and moisture
Monthly Requirements
Filters and Moisture
Handpiece/s Handpiece Hose/s and Nozzles
Pinch Tube (check)
Quarterly Requirements
Pinch Tube (replace)
BI-Annual Requirements
Pinch Valve Assembly (lubricate)
Inspect Canister components
Annual Requirements
Air In and Out In-Line Filters (replace)
Internal Tubing (re-tube)
Powder Canister (replace components)
Maintenance Checks
No.
Maintenance item
6 mo.
12 mo.
18 mo.
24 mo.
PM 1
Maintain Pinch Valve
XX
XX
XX
XX
PM 2
Replace Filters & Tubing
XX
XX
PM 3
Maintain Powder Canister
XX
XX
PM 4
Calibrate system
XX
XX
XX
XX
PM 1.
Maintain pinch valve block 6/12 Months):
.50 hour
One Year Maintenance Kit
K150034
PM 2.
Replace the Filters and tubing (12 months):
1.0 hour
One Year Maintenance Kit
K150034
PM 3.
Check Powder Canister (6/12 months):
0.5 hour
One Year Maintenance Kit
K150034
Check Canister Gasket and lid
Clear powder ports and back flush canister
Clean Gasket and Canister lid
Clear and measure Orifice Plate holes
Replace powder and verify system operation
Maintain Powder Canister (12 month)
1.0 hour
One Year Maintenance Kit
K150034
PM 4.
Calibrate system (6 months):
1.0 hour
Verify and calibrate using procedure