STEP 5:

Insert the battery platform in

the bottom of the enclosure. The bat-

tery platform has cutouts so wires

can be routed under the battery as

needed.

STEP 6: Mount any extra equip-

ment that will reside inside the enclo-

sure. Equipment can be mounted to removable backplate or to a plate

mounted to the door rails.

STEP 7: Install the batteries in the enclosure. If using multiple bat-

teries, connect in parallel for 12V output or connect in series for 24V

output.

12V 200Ah battery configuration is shown here.

For 12V 100Ah two batteries

are connected in parallel

with Plus(+) connected to

Plus(+) and Minus(-) con-

nected to Minus(-).

For 12V 200Ah the 100Ah

configuration is doubled with

separate battery connection

wires to controller.

24V two battery and 24V

and 48V four battery con-

figurations are shown be-

low: Batteries are connect-

ed in series, with Plus(+)

connected to Minus(-).