Tycon Power UPS-ST24-100-8-UBNT User Manual
Page 5

5
STEP 12: Switch off controller and connect AC to the controller.
Be sure to follow local regulations for outdoor 120/240VAC connec-
tions.
STEP 13: Connect the load to the controller LOAD terminals. Be
sure to observe proper polarity. Switch on the controller to activate the
charging.
STEP 14: Plug or Tighten all wire feedthrus. If they don’t tighten on
a small diameter wire, you can wrap some electrical tape around the
wire in the seal area to increase its diameter and make a better seal.
The enclosure needs some small amount of venting so be sure NOT to
seal all holes and feedthrus with silicon.
STEP 15: Make sure lid gasket is clean and free from any parti-
cles, then carefully close the cover, making sure that wires are clear of
the seam and hinge area. Use the special key to close the two cover
locks.