beautypg.com

Tycon Power UPS-ST24-100-8-UBNT User Manual

Page 5

background image

5

STEP 12: Switch off controller and connect AC to the controller.

Be sure to follow local regulations for outdoor 120/240VAC connec-

tions.

STEP 13: Connect the load to the controller LOAD terminals. Be

sure to observe proper polarity. Switch on the controller to activate the

charging.

STEP 14: Plug or Tighten all wire feedthrus. If they don’t tighten on

a small diameter wire, you can wrap some electrical tape around the

wire in the seal area to increase its diameter and make a better seal.

The enclosure needs some small amount of venting so be sure NOT to

seal all holes and feedthrus with silicon.

STEP 15: Make sure lid gasket is clean and free from any parti-

cles, then carefully close the cover, making sure that wires are clear of

the seam and hinge area. Use the special key to close the two cover

locks.