4. INSPECTING AND HANDLING THE UNIT

At delivery, the package should be checked and any damage should

be reported immediately to the service agent.

When handling the unit, take into account the following:

Fragile, handle the unit with care.

Keep the unit upright in order to avoid compressor

damage.

Choose on before hand the path along which the unit is to be

brought in.

Move this unit as originally package as possible.

When lifting the unit , always use protectors to prevent belt

damage and pay attention to the position of the unit’s centre

of gravity.

1

2

3

4

NOTE

5. INDOOR UNIT INSTALLATION

Keep indoor unit, outdoor unit, power supply wiring and

transmission wiring at least 1 meter away from televisions

and radios. This is to prevent image interference and

noise in those electrical appliances. (Noise may be

generated depending on the conditions under which the

electric wave is generated, even if 1 meter is kept.)

There is enough room for installation and maintenance.
The ceiling is horizontal, and its structure can endure the

weight of the indoor unit.
The outlet and the inlet are not impeded, and the

influence of external air is the least.
The air flow can reach throughout the room.
The connecting pipe and drainpipe could be extracted out

easily.
There is no direct radiation from heaters.

5.1 Installation place

The indoor unit should be installed in a location that meets

the following requirements:

5.2 Install the main body

Please refer to the following figures for positioning 4 screw

bolts.

Evaluate the ceiling construction and please install with

Ш

10

/

Ш

0.394in hanging screw bolts.

1 Installing

Ш10/Ш0.394in hanging screw bolts. (4 bolts)

Consult the construction personnels for the specific procedures.

Do keep the ceiling flat. Consolidate the roof beam to avoid

possible vibration.

Carry out the pipe and line operation in the ceiling after finishing

the installation of the main body. While choosing where to start

the operation, determine the direction of the pipes to be drawn

out. Especially in case there is a ceiling, position the refrigerant

pipes, drain pipes,indoor & outdoor lines to the connection

places before hanging up the machine.

The installation of hanging screw bolts.

Cut off the roof beam.
Strengthen the place that has been cut off, and consolida-

tethe roof beam.

After the selection of installation location, position the refriger-

ant pipes, drain pipes,indoor & outdoor wires to the connection

places before hanging up the machine.

The installation of hanging screw bolts.

Fig.5-2

Fig.5-1

Confirm the minimum drain tilt is 1/100 or more

Wooden construction

Put the square timber traversely over the roof beam, then install

the hanging screw bolts. (Refer to Fig.5-2)

5.2.1

Timber over the beam

Roof beam

Hanging screw bolts

Ceiling

Maintenance roomage

checking orifice

600mmX600mm/23.622inX23.622in

300mm/11.811in or more

200mm/7.874in or more