Frame-install-anchors-inside-glz, Inside glaze frame installation, Interior – Oldcastle BuildingEnvelope FG-2000 User Manual
Page 20

INSIDE GLAZE FRAME INSTALLATION
FG-2122X4" LONG
(PART SOLD IN STOCK LENGTHS)
FG-2188
PVC PROFILE
USED TO IMPROVE
INSTALLATION OF
BACKER ROD AND
PERIMETER SEALANT.
(OPTIONAL)
ACCESS HOLE
(SIZE DETERMIMED BY ANCHOR.)
INTERIOR
CLEAR HOLE
(SIZE DETERMIMED BY ANCHOR.)
FG-2000-FP-1
PART #: 7943
1/4" DIA. WEEP HOLE
C OF MULLIONS
L
ANCHOR SIZE AND FREQUENCY SHOULD BE DETERMINED BY STRUCTURAL REQUIREMENTS.
SILL ANCHORS FG-2000-FP-1 AND HEAD ANCHORS FG-2122 SHOULD BE
THE ANCHOR IS NOT MORE THAN 4" FROM EACH SIDE OF THE MULLION.
LOCATED SO THAT
F G - 1 0 0 0 - F G - 2 0 0 0 S T O R E F R O N T I N S T A L L A T I O N M A N U A L
Phone: 1-866-OLDCASTLE (653-2278)
Web Address: www.oldcastlebe.com
19
FEBRUARY 2012
SEALANT
This manual is related to the following products: