11_fs_jamb_assembly_ig – Oldcastle BuildingEnvelope 6000 Series Thermal MultiPlane User Manual
Page 12

11
S E R I E S 6 0 0 0 T H E R M A L M U L T I P L A N E I N S T A L L A T I O N M A N U A L
INSIDE GLAZED, FRONT SET
JAMB ASSEMBLY FOR SSG SYSTEM
5/8
"
Reference page 22 for
use of DJ-10 drill fixture.
5/8
"
FG-6293
Use with captured
mullion (see pg. 10 for
fabrication notes on
vertical)
FG-6332
Use with SSG mullion
Apply silicone sealant to
ends of horizontals and
verticals as shown
FG-6281 standard sill
FG-6280 low profile sill
FG-3278 setting block
Drill 5/16" dia weep holes;
locate at 1/4 points (do not
cover with setting block)
FS-8
part #10223
FG-3000-PP-56 end dam
Align with glazing pocket of
jamb and seal to jamb
and sill members
Apply silicone sealant in
glazing reglet of vertical
where it marries with the
sealant applied to the
horizontal
Top of FG-6332
horizontal
1-1
/16
"
Notch at head
9/1
6"
2-5
/8"
FG-6281
#11 (0.191 dia)
tap hole
FS-9
part #553
FG-6333-01
part #34910
FS-55
FG-6291
FS-8
part #10223
"F" (0.257 dia) drill
at head and sill
AN-050-01 dam;
bed in sealant
2-5
/8"
1-3/4
"
2-5
/8"
1-3/4
"
9/1
6"