beautypg.com

0 pre-installation tasks – ETS-Lindgren 2005 Single Axis Positioner User Manual

Page 17

background image

Pre-Installation Tasks

| 17

4.0 Pre-Installation Tasks

Before installing any components, follow the

safety information in the ETS-Lindgren Product

Information Bulletin included with your shipment.

Ensure power is off and base is secured before

proceeding with installation.

Pre-planning is essential for successful installation. Discuss requirements with

your sales representative and request dimensional drawings prior to construction

of your site.

Tools Required

3/8” open/box end wrench

7/16“ open/box end wrench

• 3/16”

Allen

wrench

• #2

Phillips

screwdriver

• Wire

cutters

• Pry

bar

Level (i.e. torpedo laser)

• Black

marker

Adjustable wrench

Drill with 1” bit for filter penetration in shield

1/4” hex-head driver to open filter box

Self tapping screws to mount filter

Scouring pad suitable for cleaning stainless steel surfaces