Series 5900 Inside Glazed Curtain Wall Installation Instructions

DIMENSION CHECK
EVERY 5 UNITS

OVERALL

DIMENSION CHECK

ELEVATION

*

*

Section IV: Frame Assembly

Frame Assembly

A.)

Assemble shear blocks, splices, anchors, etc. to mullions as required.

B.)

Install the exterior gaskets in the vertical pressure plates as required. The exterior

vertical gaskets are to run continuous, butted together at the splice joints.

C.)

Install and anchor the vertical

mullions to form the vertical
sections per the “APPROVED”

shop drawings.

D.)

Attach horizontal members to

the shear blocks. Fasten with
screws thru the underside of

the horizontal members.

E.)

Interior horizontals are cut

D.L.O. – 1/32”. The erector is
to split the difference on both

sides.



F.)

The horizontals

can be dropped in
from the top.

G.)

After the
horizontal is in

position, attach
with #10 X 5/8”

HW SMS Tek3
fasteners from the

underside.

H.)

Wipe away excess

sealant from the
face and top of

the horizontals.


Note: Check overall frame dimensions on every 5

openings on long runs to avoid dimensional
build-up.

#10 X 5/8” HW SMS Tek3

¼” X 1 ½” HWHSMS

Apply sealant to the face and to the top

of the shear block as shown.

Note: The commercial cut to length tolerance is

+- 1/16”. It is critical to check every 5

th