EFCO S5900 Inside Glazed User Manual
Page 2

EFCO CORPORATION 6/2012 PART NO. Y352
Page 2 of 18
Series 5900 Inside Glazed Curtain Wall Installation Instructions
TABLE OF CONTENTS
SECTION
PAGE
I.
General Notes & Guidelines …………………………………………….…… 3-4
II. Perimeter Application ………...…….…………………………………….….. 5
III. Anchor Installation ………………..………………………………………..….. 6
IV. Frame Assembly .………………….…………………………………………..… 7
V.
Frame Installation .………………..……………………………………………. 8
VI. Vertical Splice Joints ………………….……………………………….………. 9
VII. Exterior Cover Installation……………………………………………….…… 10
VIII. Glazing Adaptor Installation .….……………………………………….…… 11
IX. Glazing ……………………….……………………………………………..……… 12-16
X.
Steel Reinforcement …………………………………………………………… 17
Minimizing Condensation
Note: Please reference EFCO's "Understanding Condensation" brochure which can be obtained
through your EFCO representative.
Condensation will form on any surface when unfavorable conditions (interior temperature
and relative humidity and exterior temperature) are present. When the formation of excessive
condensation is a concern, it is highly recommended that a design professional is utilized to
perform an analysis of the shop drawings to recommend the best possible installation methods.
Please contact your EFCO representative for information on EFCO's Thermal Analysis Services.
Many current installation practices lead to an increase in the possibility of the formation of
condensation. Though not all inclusive, the list of examples below illustrates conditions under
which condensation is likely to occur:
1. Bridging system thermal break with non-thermally broken metal flashing or lintels
that are exposed to the exterior
2. System exposure to cold air cavities
3. Interior relative humidity levels not maintained at recommended levels, see
EFCO’s “Understanding Condensation” brochure
4. Inadequate separation between system and surrounding condition at perimeter
5. Product combinations during the shop drawing stage that result in bridging thermal
breaks of one or all products involved