beautypg.com

EFCO S5900 Inside Glazed User Manual

Page 18

background image

EFCO CORPORATION 6/2012 PART NO. Y352

Page 18 of 18

Series 5900 Inside Glazed Curtain Wall Installation Instructions

D.)

Follow instructions on pages 8 thru 14 in glazing the spandrel areas at floor lines.

It may be necessary to remove the ceiling line from the floor below to achieve
access for gasket installation.

E.)

Follow instructions in standard glazing procedures to reinstall vision lites.

Section X: Steel Reinforcement

Steel Reinforcement

A.)

At large spans or in high wind load areas, steel reinforcement may be necessary.

B.)

Reinforcement requirements will vary on a per job basis.

C.)

Reference the “APPROVED” shop drawings for steel requirements and locations.




D.)

When steel reinforcement is factory installed in the mullions, use fasteners to
prevent damage or slippage of the steel during shipping.