EFCO S5900 Inside Glazed User Manual
Page 15
![background image](/manuals/636005/15/background.png)
EFCO CORPORATION 6/2012 PART NO. Y352
Page 15 of 18
Series 5900 Inside Glazed Curtain Wall Installation Instructions
FIG. 4
Section IX: Glazing
Glazing
FIG. 5
5.) Remove the temporary glazing wedges and install the interior wedge. Cut the
gasket the same as noted in page #13.
6.) Gaskets with factory molded (Vulcanized) corners are optional.
If molded corners are used, installation should be as follows:
a.) Start at the top and bottom corners and work to the center.
Make sure the corners are square and true, and that full
engagement of the gasket is achieved. The gasket should
be slightly larger requiring some “crowding”. Gaskets should
NEVER BE STRETCHED TO FIT.
Floor line
Ceiling
horizontal
Stool horizontal
Molded Corners
Tape the top of the
gasket assembly to
the mullion face
when using Molded
Corner gaskets.
“W” type jamb spacer
at shallow pocket
1” Infill
“W” type jamb spacer
at deep pocket
“W” type jamb spacer block at
centerline of D.L.O. height
“W” type jamb spacer block at
centerline of D.L.O. height
¼” Infill