Series 5900 Inside Glazed Curtain Wall Installation Instructions

Section II: Perimeter Application

Perimeter Application

A.)

For anchoring to perimeter and providing a spacer for glazing pockets at head,
jamb, and sill.


Note: Anchoring surfaces of perimeter constructions must be level and plumb

within the adjustments of the head, jamb, or sill. See “APPROVED” shop
drawings for adjustment limits.

Fill gasket race with sealant in top

bottom of each vertical mullion to

marry with perimeter sealant.

Pressure plate

with return

CRITICAL

SEAL LINE

Primary seal

Optional

cosmetic seal

Top anchor is recommended

at head connection to

accommodate thermal

movement.

“M” Anchor

Line of critical

perimeter

sealant shown

Size and locate

anchor bolts in the

field, based on job

conditions and
structural load

requirements.

½” Nominal.

(3/8” Minimum)

“M” Anchor

“F” Anchor

Mullion Anchors

Note: The perimeter caulking must be done prior to glazing. Reference the

“APPROVED” shop drawings for caulk joint size unless otherwise specified.
Most sealant manufacturers recommend a 3/8” minimum joint width.

Refer to page #7 for further information on

horizontal installation and sealant methods.

Filler is cut short to

clear shear block.

Erector to supply and apply

bond breaker tape across face

of anchor to prevent 3-sided

sealant adhesion.