Taylor-Wharton High Capacity GST Storage Tanks User Manual
Page 13

13
Requirements for Installation and Use Within New York City Fire Department
Jurisdiction
Owners and installers within NYCFD jurisdiction are required to meet the following guidelines
concerning the installation and use of GST-250 design bulk tanks.
• The installation and use of the vessel must comply with all applicable New York City Codes,
Rules, and Regulations.
• After installation, the vessel shall not be filled until the required New York City Fire
Department storage permit has been issued.
• The owner / installer shall be in compliance with all of the manufacturer’s installation and
maintenance procedures and limitations.
• The liquid level gauge is to be marked to indicate the maximum permissible fill level for the
respective gas being utilized.
• The vessel fill capacity shall be limited to comply with CGA-341 (Standard for Insulated
Cargo Tank Specification for Cryogenic Liquids).
• The vessel is for outdoor use only, will be placed in areas acceptable to NYCFD, and must be
protected from vandalism.
• Changes in ownership or owner’s name must be reported to NYCFD in writing.
WARNING: Failure to comply with the conditions of Certificate of Approval #4956 can
be the basis for being subjected to enforcement action that can include fines
and imprisonment.