beautypg.com

Samson DOUBLE BRAID Class II Eye Splice Modified for TS-II Turbo User Manual

Samson Tools

background image

PAGE 1 OF 8

SamsonRope.com

| Email

[email protected]

| Tel

+1.360.384.4669

Double Braid Class II Eye Splice Modified for TS-II Turbo

S A M S O N S P L I C I N G I N S T R U C T I O N S

The measurements are the same as those for the direct bury eye splice for

Class II ropes. Measure 3 fid lengths from the end and make Mark 2.
Form the desired size of the eye, and make Mark 3 adjacent to

Mark 2. From Mark 3, measure 3-1/2 fid lengths and make Mark 4.

The splice area must be covered with DC Gard at the completion of the

splice. Cut a piece of DC Gard that is 5-1/2 fid lengths long (the distance

from Mark 3 to Mark 4 plus 2 fid lengths.) Slide the DC Gard onto the

rope and beyond Mark 4*.

Cut cover here

Mark 2

Measure 1-1/2 fid

Measure 2 fids

Measure 3-1/2 fids

Measure 3 fids

Desired size eye

Mark 3

Mark 4

Mark 2

DC Gard

Slide

Slide

Mark 3

Mark 4

Mark 4

I n s ta l l I n g D C g a r D f o r s p l I C e a r e a

2

step

M e a s u r I n g a n D M a r k I n g

1

step