Amico NFPA Triplex RVL Modular Stack Mount User Manual
Page 14
Amico Source Equipment
2.
Medical air, instrument air, medical vacuum and WAGD controls are to be wired in accordance
with
NEC.
3.
MGEM will include with submittals an affidavit attesting to compliance with all relevant paragraphs
of NFPA 99 most recent edition including (d) below.
4.
MGEM personnel assembling medical air, instrument air, vacuum and WAGD plant shall meet the
latest edition of NFPA 99 section titled “Qualification of Installers” and hold medical gas
endorsements as under ASSE 6010.
5.
The Contractor shall furnish documentation attesting that all installed piping materials were
purchased cleaned and complied with the requirements of NFPA 99 5.1.10.1 and 5.1.10.2.
6.
The Contractor shall furnish copies of ASSE 6010 qualifications for all workers installing medical
gas
piping.
B.
Installation and Start-up
1.
The MGEM will provide authorized representatives to review installation and perform initial start up
of
system.
C. Warranty
1.
Warranty will be expressly complete, include all components of the system and be the responsibility
of the MGEM for record only. Warranties limiting the responsibility of the MGEM for any system
component or which pass through the MGEM to another manufacturer are not acceptable.
2.
All source medical gas components shall be warranted by the MGEM of record for a minimum of 30
months from date of shipment.
3.
Warranties shall include on site repairs including travel, labour and parts.
4.
Shipping and installation costs after the first 12 months will be borne by the customer.
D. Verification
1.
Medical Gas Contractor shall deliver to the owner a complete system certification.
PART 2 - PRODUCTS
QUALIFICATION OF MANUFACTURER(S)
A. The manufacturer shall supply all of the medical gas systems and equipments to include outlets, valves and
gauges,
valve boxes, alarm panels, manifolds, medical air, instrument air, vacuum and WAGD sources.
B.
The MGEM shall have a product specialist available to periodically check with the contractor during
installation of the pipeline systems equipment. MGEM shall provide service support to the hospital after
turnover. Demonstrate factory trained service technician is available within 250 miles of facility.
C.
Approved MGEM: Piping Systems Components and Medical Gas Alarms
1. Amico Corporation.
2. Alternate by _____________ with pre-approval.
12
- NFPA Triplex RVD Modular Stack Mount NFPA Triplex CCD Modular Stack Mount NFPA Quadruplex RVL Modular Stack Mount NFPA Quadruplex RVD Modular Stack Mount NFPA Quadruplex CCD Modular Stack Mount NFPA Duplex RVL Vertical Tank Mount NFPA Duplex RVL Modular Stack Mount NFPA Duplex RVL Horizontal Tank Mount NFPA Duplex RVD Vertical Tank Mount NFPA Duplex RVD Modular Stack Mount NFPA Duplex RVD Horizontal Tank Mount NFPA Duplex CCD Vertical Tank Mount NFPA Duplex CCD Modular Stack Mount NFPA Duplex CCD Horizontal Tank Mount