Electrical connection (option), Height and leveling the drill – Great Plains 3P600 Operator Manual User Manual
Page 16

12
3P500, 3P500V & 3P600
Great Plains Manufacturing, Inc.
2011-10-21
Electrical Connection (Option)
Refer to Figure 4
5.
Plug drill electrical lead into tractor seven-pin
connector. If your tractor is not equipped with an
SAE-J560B seven-pin connector, contact your dealer
for installation.
Height and Leveling the Drill
Refer to Figure 5 and Figure 9 on page 19
1.
Initially adjust drill so opener tool bar runs
18 in. (45.7 cm) above ground when drill is lowered
in the field.
2.
The drive wheel should be in the fourth mounting
hole from the top (factory setting).
Note: The drive may need to be adjusted due to ground
conditions.
3.
Level the drill frame with the top 3-point link.
Refer to Figure 6
4.
When drill is level, the gap between the spring-rod
casting and the cross bolt will be about 2 inches.
This is a general dimension that will vary with the
amount of down pressure required for your planting
conditions.
Figure 4
Lighting Connector
26467
Figure 5
Initial Field Height
18545
18 in. (45.7 cm)
Figure 6
Initial Spring Rod Reveal
10548
2.0 in.
5.1 cm