Drive chain routing, Seed cup covers, Drive chain routing seed cup covers – Great Plains 2N-3010 Operator Manual User Manual
Page 16

12
2N-2410/3010 SGS
Great Plains Manufacturing, Inc.
133-029M
2013-05-23
Drive Chain Routing
Refer to Figure 9
Route and assemble the chains onto the sprockets as
shown and tighten the idlers.
Bolt rear drive guard
in place with the u-clips
1
⁄
4
in x
5
⁄
8
in long bolts
and lock washers
.
Refer to the Hose Retainer Assembly Option or Y-Tube
Option, depending on which you have ordered, for proper
hose routing.
Seed Cup Covers
The same small seeds boxes are used for both the
7
1
⁄
2
inch and 8 inch spacings. If the 8 inch spacing is
used a seed cup cover (part number 123-190D) will need
to be installed to cover the unused openings (2 on the
24 foot drills and 4 on the 30 foot drills). Install them on
the inside of the boxes and under the seed cup bolts.
1
2
3
4
Figure 9
Chain Routing
13386
Figure 10
Seed Cup Cover
11655