beautypg.com

Assembly and setup, Pre-start checklist, Assembly and setup pre-start checklist – Great Plains 2N-3010 Operator Manual User Manual

Page 10

background image

133-029M

Table of Contents

Index

2013-05-23

6

2N-2410/3010 SGS

Table of Contents

Index

Great Plains Manufacturing, Inc.

Assembly and Setup

This section helps you prepare your drill for use.

Pre-Start Checklist

1.

Read and understand “Important Safety
Information
” on page 1.

2.

Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.

3.

Check that all grease fittings are in place and
lubricated. See “Lubrication and Scheduled
Maintenance
” on page 18.

4.

Check that all safety decals and reflectors are
correctly located and legible. Replace if damaged.
See “Safety Decals” on page 3.

This manual is related to the following products: