Great Plains Verti-Till Field Update User Manual
General information, Before you start, Verti-till field update
Great Plains Manufacturing, Inc.
General Information
1
08/06/2007
596-186M
Verti-Till Field Update
Installation Instructions for use with
5, 7 and 9-Shank Verti-Till Rippers
General Information
These instructions explain how to install the Verti-Till
Field Update. These kits bring recent engineering
enhancements to several implement components.
Each kit converts an entire implement.
These instructions apply to:
If the implement is serial number 1025 or lower, contact
the factory regarding a third kit (596-183A) which is not
described by these instructions. Implement serial num-
bers above 1079 require none of these kits.
Tools Required
• basic hand tools
• Verti-Till manuals: 596-098M Operator’s
596-098P Parts
• a tractor with 2 hydraulic circuits and suitable hitch
Before You Start
Review these instructions, and make sure you under-
stand where and how the components install, and which
existing parts are removed or re-used.
Components in the two kits covered by the manual differ,
based on the serial number of your implement. Sections
specific to particular serial numbers indicate whether to
apply or skip that section.
Enough parts are included to update a 9-shank imple-
ment. There may be excess parts on 5- and 7-shank
implements.
Notations and Conventions
“Left” and “Right” are facing in the
direction of implement travel.
An orientation rose in the line art illus-
trations shows the directions of Left,
Right, Front, Back, Up, Down.
Applies to Models:
• VT5300A, VT5300R
• VT7225A, VT7225R
• VT7300A, VT7300R
• VT9225A, VT9225R
When you see this symbol, the subsequent instructions
and warnings are serious - follow without exception.
Your life and the lives of others depend on it!
Kit
Kit Description
596-184A
VT FIELD UPD SN1026-1062 JUN07
596-185A
VT FIELD UPD SN1063-1079 JUN07
!
U
D
F
B
L
R
Figure 1
Verti-Till Ripper
21569
callouts identify components in the currently
referenced Figure or Figures.
to
callouts reference new parts from the list on
page 18. The descriptions match those on
the cartons, bags or item tags, as well as
your updated Parts Manual.
to
callouts reference affected existing parts
from the table on page 20. The descriptions
match those in your Parts Manual.
U
D
L
R
B
F
1
Document Outline
- General Information
- Before You Start
- Pre-Update Preparation
- Replace Pin Retainers
- Update Lift Cylinders
- Install Relief Valve
- Closeout
- Parts Lists
- Reference Information