Preparation and setup, Initial setup, Post-delivery/seasonal setup – Great Plains 2SF30 Operator Manual User Manual
Page 16: Pre-planting setup

155-015M-A
2014-01-09
12
2SF24/30
Great Plains Manufacturing, Inc.
Preparation and Setup
This section helps you prepare your tractor and 2SF24 or
2SF30 Drill for use, and covers tasks that need to be
done seasonally, or when the tractor/drill configuration
changes.
Before using the drill in the field, you must hitch it to a
suitable tractor, inspect systems and level the drill.
Before using the drill for the first time, and periodically
thereafter, certain adjustments and calibrations are
required.
Initial Setup
See “Appendix B - Assembly and Setup” on page 69
for first-time/infrequent setup tasks.
Post-Delivery/Seasonal Setup
On initial delivery, use with a new tractor, and seasonally,
check and as necessary, complete these items before
continuing to the routine setup items:
• Bleed hydraulic system (page 18).
• De-grease exposed cylinder rods if so protected at last
storage.
Pre-Planting Setup
Complete this checklist before routine setup:
❑ Read and understand “Important Safety
❑ Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.
❑ Check that all grease fittings are in place and
lubricated. See “Lubrication and Scheduled
Maintenance” on page 58.
❑ Check that all safety decals and reflectors are
correctly located and legible. Replace if damaged.
See “Safety Decals” on page 6.
❑ Inflate tires to pressure recommended and tighten
wheel bolts as specified. See “Tire Inflation Chart”
on page 68.