Purging Lift System
Note: When lift hoses are routed and hooked up to cylinders
and valves the systems will need purged of air. Purging
the lift system now will allow the machine to be raised
up or down for ease of gang assembly installation.
42. Charge the lift system first. Extend the lift cylinders
(black handles) until the center section is fully raised.
Remove the 3/8 x 3 transport lock pins
from transport
locks
and store on lift straps
. Raise and lower the lift
system several times to purge air from system. Watch for
leaks and retighten fittings if necessary.
43. The gang angle system may not be purged until after
hoses and valves are hooked up when gang assemblies
and cylinders are installed, See “Gang Cylinder Purg-
ing” on page 18 for purging gang system.