Fertilizer shim, Install marker tubes, At “ fertilizer shim – Great Plains YP925TD Assembly Instructions User Manual
Page 18

18
Flat Fold Marker
Great Plains Mfg., Inc.
113-870M
2012-22-03
Fertilizer Shim
If the planter does not have a fertilizer system, continue
at “Install Marker Tubes”.
Without a shim
installed, the marker discs are at
some risk of striking fertilizer tanks or hoppers when
folded.
Refer to Figure 23
102. Inspect the top side (unfolded, bottom side if folded
as shown) of each second stage mount
weldment
. If a shim
is already installed on
both, continue at “Install Discs” on page 19.
103. Select two new:
113-551D MARKER SHIM
104. Remove and save the nuts
on the two mount
weldment bolts
nearest the link lug.
105. Install shim
so that the tabs end (with holes) are
flush against the mount weldment
, and the
raised edge is toward the (disc) end of the arm.
106. Repeat step 102 through step 105 for the other arm.
When the arm is folded, the raised section of the shim
rests on the stage stop
. This holds the arm up an
extra 7
° when folded.
Install Marker Tubes
Refer to Figure 24
If the marker tubes
are already installed, continue at
107. Select one new of:
113-440D MARKER TUBE 36 LG
113-500D MARKER TUBE 42 IN LONG
113-848D MARKER TUBE 20 LG
113-855D MARKER TUBE 26 LG
108. Slide the end of the tube
that has no holes into
the rectangular hole
second stage arm
. Orient the tube so that the
tube’s bolt holes are facing to planter front and rear.
109. Select one new:
806-103C U-BOLT 1/2-13 1 17/32 X 2 3/4
and two new:
803-019C NUT LOCK 1/2-13 PLT
These fasteners may be pre-installed in the arm
weldment.
110. Secure the tube to the arm at the mount plate. The
final position of the tube is set when marker
extension is set (page 20).
111. Repeat step 107 through step 110 for the other arm.
Figure 23
Fertilizer Shim
31998
44
55
60
55
38
44
38
44
44
60
55
44
38
6
Figure 24
Marker Tube
31999
37
43
4
68
60
37
37
37
4
43
68
60