Install 3p/605/606nt chains, 3p/605/606nt gearbox to sgs chain, 3p/605/606nt sgs transmission chain – Great Plains 3P606NT Assembly Instructions User Manual
Page 13: 3p/605/606nt sgs final drive chain, Ud f b
Great Plains Mfg., Inc.
Installation Instructions
13
04/02/2009
133-140M
Install 3P/605/606NT Chains
Three new chains are installed to connect the gearbox to
the Small Seeds meter shaft.
59. Review “Chain Installation” on page 17 before
mounting chains.
3P/605/606NT Gearbox to SGS Chain
60. Select the new gearbox chain, one of:
136-057D CHAIN RL #40 42 PITCHES
136-170D CHAIN RL #40 40 PITCHES
Route the chain around the new 12T gearbox
sprocket
, the new accessory shaft input
sprocket
, and above the new left idler
.
Adjust left idler
for
1
⁄
2
in (12mm) slack in the top
span of chain
3P/605/606NT SGS Transmission Chain
61. Select the new transmission chain, one of:
136-115D CHAIN RL #40 142 PITCHES
136-163D CHAIN RL #40 217 PITCHES
Route the chain around the new accessory shaft
output sprocket
, around the final drive jackshaft
input sprocket
, above the new right rear idler
and below the new right front idler
.
Adjust right idlers
for 1in (2.5cm) slack in the top
span of chain
3P/605/606NT SGS Final Drive Chain
62. Select one new:
136-017D CHAIN RL #40 49 PITCHES
Route the chain around the final drive jackshaft out-
put sprocket
, around the final drive meter shaft
input sprocket
, and behind the final drive idler
.
Adjust final drive idler
for
1
⁄
4
in (6mm) slack in the
rear span of chain
Figure 19
3P/605/606NT New Chain Routing
18653
LEFT
RIGHT
FINAL
6
7
8
9
U
D
F
B