beautypg.com

Exide Technologies V19CIL5200ULS User Manual

Page 4

background image

Sales % Service % Recycling 888.563.6300 in the USA 800.2682698 in Canada

3

2. INTRODUCTION

The GNB

®

SCR200 battery chargers are fan cooled, solid state, microprocessor

controlled, SCR regulated chargers designed to make battery charging simple. They

are factory set to charge ELEMENT valve-regulated lead-acid batteries

,

but a GNB

Industrial Power service representative may configure it to charge GNB

®

, Tubular-

HP

®

, or Liberator

®

®

flooded lead-acid batteries. The charger has a comprehensive

self-checking diagnostic program to control all charger functions, monitor the quality

of charge and check its own safety conditions. Large easy to read LEDs, two button

keypad and LED display report on the charger and battery status.

3. RECEIVING CHARGER

Examine the charger thoroughly before using, to make sure that no parts have been

loosened or damaged during shipment. Check the contents of the package against

the delivery slip before disposing of the shipping package. If any shipping damage or

partial loss is found, file a claim with the carrier without delay and take any necessary

steps to protect your rights. Before installing, check that the charger nameplate data

corresponds to the packing slip and to the model specified on the original sales

order. The SCR200 chargers are delivered on skids for easy handling using a forklift

truck.

4. LOCATION AND INSTALLATION OF CHARGER

Proper installation is important in order to achieve good charger performance and

long trouble free operation and to prevent damage to the charger and batteries. The

charger should be located in a clean, cool, normal ambient room temperature

(between +32

o

F/0

o

C and 104

o

F/40

o

C), dry and well-ventilated area. In order to permit

free air flow for convection cooling allow four inches minimum between the charger

and any wall, six inches from other equipment, and never store anything beneath or

on top of the charger.

5. STACKING

The following recommendations should be taken into consideration when stacking

these units:

a) The base unit should be secured to the floor or a solid base using appropriate

bolts and with accordance to local building codes and regulations.

b) These units can be stacked to a maximum 3 high.

c) If a lifting sling is used, the sling should be placed under the unit where the base

plate is located to avoid damage to the units.

Lifting Sequence is as follows: -

a) Secure the base unit to the floor or solid base. The bolts can be accessed and

secured from the underside of the unit at the front and rear or from inside the unit

where the large holes are located directly above mounting holes (see appendix G

Sales • Service • Recycling 888.563.6300 in the USA 800.268.2698 in Canada