OPERATING PROCEDURE
I.
Turning on the Unit
1.
Connect charger to truck’s battery using DC connectors.
2.
Energize the AC Mains.
3.
Energize the side panel AC input main disconnect switch (
RED
). Verify that the LCD display
is lit and displays the
“Connect Battery” screen shown below.
4
8
V
2
0
0
A
0
7
/
1
9
/
0
7
1
2
:
0
0
:
0
0
C
O
N
N
E
C
T
B
A
T
T
E
R
Y
D
I
S
P
L
A
Y
If the LCD is not lit, if the above message is not displayed, or the fans are not operating,
perform the following:
A. Turn off the unit (de-energize the disconnect switch)
B. Ensure proper AC wiring
C. Ensure the main AC disconnect (wall) is energized
D. Verify fuses in main AC junction box (wall)
E. If wiring and fan operation check OK proper and the problem persists, contact GNB
Industrial Power.
Note: The LCD will display the battery voltage and the maximum current settings on the first line,
namely 48V and 250A for a 10kW ELEMENT
charging system.
Battery Voltage Setting
Charger Maximum Current