INSTALLATION

4.1

UNPACKING

After unpacking, the pump should be checked for any damage that may have occurred during shipment.
Damage should be reported to the carrier immediately.

The following items should be included within the shipping container:

Qty

Item

Description

1

610RC

Magnum 610RC Pump

1

M610RC

Operation/Maintenance Manual

1

C0135

Check Muffler Assembly

1

C0145

Conductive Connector Group

4.2

TIE BOLT TORQUE

The tie bolts on the pump are tightened before leaving the factory. However, relaxation may occur due to
handling, material creep, or other unforeseen events. Trebor recommends that all eight tie bolts be re-
tightened upon pump install. The following procedure should be used.

1. Remove black tie bolt caps (Item 5 in 6.4 Parts Illustration) from both sides of all 8 tie bolts.

2. Apply 42 in-lbs. of torque to each slave side bolt while holding the master side bolt stationary. A

star-pattern is advised.

a. The master side is the left side of the pump if you are looking at the fluid ports.

3. Replace tie bolt caps.

4.3

UTILITIES / HOOK-UP

The pump is mounted using four 1/4” bolts. It is recommended that the pump be mounted not more than
15° from level to maintain its self-priming ability and pumping efficiency.

Air Inlet:

1/4” NPTF (

3/8” [8mm] supply tube minimum).

Air Supply:

20-60 PSIG (.14

– .41 MPa) clean dry air or nitrogen. (See Performance Charts, Section

5.1, for air consumption.)

Fluid Ports:

IN/OUT: 3/4” NPT; IMPORTANT SUCTION (“IN”) LINE REQUIREMENTS: (for maximum
flow)

1.

Maximize supply line diameter. Minimum 3/4” tubing or 1/2” pipe recommended.

2. Minimize supply line length.

3. Minimize supply line restrictions; valves, fittings, etc.

Grounding:

Use the supplied Conductive Connector Group to attach the pump to an appropriate
facility ground. The pump attachment is located behind the mounting base (see Figure
4-1)
and is tapped for this group. It is advised to ensure your pump is properly installed.
This can be done by measuring the resistance to ground which should be less than
1,000,000 ohms from either pump head.

CAUTION: If pipe work is not properly installed, it may pose a risk to personnel, equipment or
environment, when operating in areas with explosion hazard.

ATTENTION: All Local codes must be followed during installation and operation of this pump.