6maintenance – Trebor 610RC Magnum User Manual
Page 10

Page 10
M610RC
8100 South 1300 West, West Jordan, Utah 84088 USA Tel: 801-563-0303 Fax: 801-255-2312
www.treborintl.com
6
MAINTENANCE
Trebor pump maintenance can be divided into two categories: air system maintenance and fluid system
maintenance. The purpose of air system maintenance is to prevent air system failures such as stalling or
erratic cycling. The purpose of fluid system maintenance is to maintain suction lift and maximum fluid
capabilities.
PUMP REBUILD SERVICE
Trebor provides a factory rebuild service for customers using Trebor products. Trebor will rebuild any
standard pump (exclusive of options). Please contact Trebor’s Sales Department for current rebuild
pricing. The fixed rebuild price includes a factory rebuild and parts equivalent to the standard rebuild kit.
Each factory rebuild comes with a new one-year warranty. Repairs requiring more extensive part
replacements will be quoted prior to proceeding with the pump rebuild. If the pump has exceeded its
useful life and cannot be rebuilt, the customer may elect to purchase a new Trebor pump. If the customer
chooses not to rebuild or replace the pump, a $150.00 evaluation charge will be required.
All returned pumps are to be shipped freight prepaid with a valid purchase order for the cost of rebuild
service. Please contact Trebor prior to returning your pump to obtain an RMA Number and Pump Return
Data Sheet to ensure proper safety precautions. Each pump will be evaluated and repaired within 5
working days of the receipt of pump at Trebor facility.
CAUTION: Be aware that the pump will contain residual liquid when it is removed from service.
Please follow the instructions in the Pump Return Data Sheet for proper decontamination
before returning the pump to Trebor.
6.1
PREVENTIVE MAINTENANCE SCHEDULE
The following maintenance schedule is recommended to optimize pump performance and minimize
failures. Tie bolt torque should be checked prior to installation and every twelve months thereafter.
Adhering to the recommended preventative maintenance schedule along with periodic inspection of the
pump will ensure continued efficient operation and overall reliable pump performance.
MAGNUM 610RC PUMP
Replacement
Inspection
Component / Comments
6 M
o
n
th
1 Y
ea
r
2 Y
ea
r
3 M
o
n
th
6 M
o
n
th
1 Y
ea
r
2 Y
ea
r
X
Shuttle Spool System
X
Tie Bolt Retorque
X
Check Balls and O-Rings
X
Check Balls and O-Rings (High Suction Applications)
X
Shaft Seal and Shaft
X
Shaft Seal and Shaft (High Suction Applications)
X
Diaphragms and Main Seals
X
Diaphragms and Main Seals (H
F
)
X
Diaphragms and Main Seals (ACT 935 & TMAH)
Recommended tie bolt torque is 42 in-lbs.