beautypg.com

Burnham SCG User Manual

Page 69

background image

69

Figure 40: Silicone Tubing Assembly

Figure 41: Blower Vent Connector Assembly

d. Remove wires to Flame Roll-out Switch.

e. Remove air diffuser screen.

f. Remove Burner Access Panel.

g. Mark location of Main Burner with Pilot Bracket

on gas manifold.

h. Hold Main Burner on throat. Lift front of

burners to clear orifi ce. Burner which holds pilot
can be removed by lifting the burner adjacent to
its right fi rst.

2. Disconnect Vent Connector and Vent Pipe from

Blower Outlet

3. Remove Jacket Top Panel.

4. Disconnect the Black and Gary Silicone Tubing

from the Canopy.

5. Disconnect Wiring Harness from Blower Motor.

6. Remove Canopy/Blower Assembly.

a. Loosen the (4) screws from Canopy.

7. Remove Flue Gas Baffl es. Inspect Flue Gas Baffl es

for deterioration.

8. Inspect fl ue passages. Clean with fl ue brush. See

Figure 42.

9. Inspect heating surface in combustion chamber.

Clean with straight handle wire brush.

10. Install Flue Gas Baffl es.

11. Replace Canopy/Blower Assembly.

12. Connect Silicone Tubing between Pressure Fittings

on Canopy Assembly and Pressure Switch. Route
through bushings in Vestibule Panel . See Figure
40.

13. Install Jacket Top Rear Panel.

14. Connect Vent System. See Figure 41.

15. Connect Blower Motor Wiring Harness.

E.

Main Burners and Firebox.

1. Vacuum fi rebox. Exercise care - do not damage base

insulation.

2. Clean main burners. Brush top of burners with soft

bristle brush. See Figure 42. Vacuum to remove any
dirt and lint.

3. Vacuum tip of pilot burner.

4. Check gas orifi ces for lint and dirt. Clean as

necessary.

5. Install main burners by reversing procedure to

remove burners.

a. Pilot burner must be installed in original

location. See Table 11.

b. Main burners must be properly secured in burner

tray slot at rear of fi rebox and over gas orifi ce.
See Figure 42.

c. Pilot gas supply and pilot lead wires must be

reconnected.

d. Burner access panel must be securely in place.

e. Reinstall air diffuser screen.

f. Reconnect Flame Roll-out wires.

g. Air Intake Box Front Door must be installed.

F.

Check

operation. Follow steps G through P from

Section VIII: System Start-up.