beautypg.com

Iv. water piping and trim – Burnham SCG User Manual

Page 45

background image

45

A.

Design and install boiler and system piping to

prevent oxygen contamination of boiler water and
frequent water additions.

1. There are many possible causes of oxygen

contamination such as:
a. Addition of excessive make-up water as a result

of system leaks.

b. Absorption through open tanks and fi ttings.
c. Oxygen permeable materials in the distribution

system.

2. In order to insure long product life, oxygen sources

must be eliminated. This can be accomplished by
taking the following measures:

a. Repairing system leaks to eliminate the need for

addition of make-up water.

b. Eliminating open tanks from the system.
c. Eliminating and/or repairing fi ttings which allow

oxygen absorption.

d. Use of non-permeable materials in the

distribution system.

e. Isolating the boiler from the system water by

installing a heat exchanger.

f. Use properly designed and operating air

elimination devices in water piping.

B.

Low Water Cut Off (LWCO) on Hot Water Boilers

(Optional)

G

N

I

N

R

A

W

o

t

s

e

r

i

w

y

r

o

t

c

a

f

t

u

c

o

t

T

P

M

E

T

T

A

T

O

N

O

D

f

f

O

t

u

C

r

e

t

a

W

w

o

L

t

e

k

r

a

m

r

e

t

f

a

n

a

l

l

a

t

s

n

i

s

n

o

i

t

c

e

n

n

o

c

e

s

u

y

l

n

O

.

)

O

C

W

L

(

t

u

C

r

e

t

a

W

w

o

L

r

o

f

d

e

i

f

i

t

n

e

d

i

y

l

l

a

c

i

f

i

c

e

p

s

.

f

f

O

f

f

O

t

u

C

r

e

t

a

W

w

o

L

e

h

t

w

o

l

l

o

f

,

s

e

s

a

c

l

l

a

n

I

.

s

n

o

i

t

c

u

r

t

s

n

i

s

'

r

e

r

u

t

c

a

f

u

n

a

m

)

O

C

W

L

(

When

A low water cutoff is required to protect a hot water
boiler when any connected heat distributor (radiation)
is installed below the top of the hot water boiler (i.e.
baseboard on the same fl oor level as the boiler). In

IV. Water Piping and Trim

addition, some jurisdictions require the use of a LWCO
with a hot water boiler.

Where

The universal location for a LWCO on both gas and oil
hot water boilers is above the boiler, in either the supply
or return piping. The minimum safe water level of a
water boiler is at the uppermost top of the boiler; that is,
it must be full of water to operate safely.

What

Kind

The SCG boiler is designed to accept the wiring of the
Safgard Model 1100-H4 (P/N 45-1104) LWCO. This is
a probe type LWCO. The factory wiring is designed to
allow simple “Plug-in” installation of the wiring.

How to Pipe

A “tee” is commonly used to connect the probe LWCO
to the supply or return piping, as shown below.

G

N

I

N

R

A

W

r

o

r

e

l

i

o

b

o

t

e

g

a

m

a

d

d

n

a

n

o

i

t

a

r

e

p

o

r

e

p

o

r

p

m

i

n

i

t

l

u

s

e

r

y

a

m

r

e

l

i

o

b

e

p

i

p

y

l

r

e

p

o

r

p

o

t

e

r

u

l

i

a

F

.

e

r

u

t

c

u

r

t

s

r

e

l

i

o

b

l

e

e

t

s

d

n

a

n

o

r

i

f

o

n

o

i

s

o

r

r

o

c

e

s

u

a

c

l

l

i

w

r

e

t

a

w

r

e

l

i

o

b

f

o

n

o

i

t

a

n

i

m

a

t

n

o

c

n

e

g

y

x

O

r

e

v

o

c

t

o

n

s

e

o

d

y

t

n

a

r

r

a

W

d

r

a

d

n

a

t

S

s

'

m

a

h

n

r

u

B

.

e

r

u

l

i

a

f

r

e

l

i

o

b

o

t

d

a

e

l

n

a

c

d

n

a

,

s

t

n

e

n

o

p

m

o

c

d

e

s

u

a

c

p

u

-

d

l

i

u

b

)

e

m

i

l

(

e

l

a

c

s

r

o

r

e

t

a

w

r

e

l

i

o

b

f

o

n

o

i

t

a

n

i

m

a

t

n

o

c

n

e

g

y

x

o

y

b

d

e

s

u

a

c

s

m

e

l

b

o

r

p

.

r

e

t

a

w

f

o

n

o

i

t

i

d

d

a

t

n

e

u

q

e

r

f

y

b

LWCO Location

Select the appropriate size tee using the LWCO
manufacturer’s instructions. Often, the branch
connection must have a minimum diameter to prevent
bridging between the probe and the tee. Also, the run
of the tee must have a minimum diameter to prevent
the end of the probe from touching or being located too
close to the inside wall of the run of the tee.

Ideally, manual shutoff valves should be located
above the LWCO and the boiler to allow for servicing.
This will allow probe removal for inspection without