Directory
Brands
Burnham manuals
Water boiler
SCG
Manual

Burnham SCG User Manual

Page 40

  • Text mode
  • Original mode
background image

40

Figure 15: Indoor Air - Horizontal / Vertical Vent Terminal Installation

Extend Vent/Air Intake Piping to maintain minimum vertical (“X”) and minimum horizontal (“Y”) distance of twelve
(12) inches from roof surface. Allow additional vertical (“X”) distance for expected snow accumulation.

Figure 14: Optional Indoor Air - 3” or 4” Vent Terminal Installation

Figure 16: Indoor Air - Air Intake Terminal Installation

Pages: 1 … 38 39 40 41 42 … 92
  • wrong Brand
  • wrong Model
  • non readable
See also other documents in the category Burnham Water boiler:
  • 81433101R16-1/10 (40 pages)
  • Gas-Fired (4 pages)
  • Independence IN8 (1 page)
  • Independence IN9 (92 pages)
  • ALP105 (100 pages)
  • 53A (22 pages)
  • CHG150 (72 pages)
  • Series 2B (52 pages)
  • LEDV-3 (1 page)
  • ALP399 (3 pages)
  • MST513 (4 pages)
  • HF SERIES (28 pages)
  • SL AL119SL (1 page)
  • PVG (64 pages)
  • Independence PV (6 pages)
  • V9A (64 pages)
  • SERIES 3 1099-01R1-/10 (8 pages)
  • RSA (52 pages)
  • E4 (8 pages)
  • SCG 1100-H4 (96 pages)
  • SERIES 2 (6 pages)
  • MEGASTEAM MST396 (68 pages)
  • V7 SERIES (47 pages)
  • V9 (4 pages)
  • LE L7248 (28 pages)
  • LEDV SERIES (36 pages)
  • MST396 (64 pages)
  • ES2 (52 pages)
  • ALP080 (7 pages)
  • Minuteman II (6 pages)
  • PVG & SCG (4 pages)
  • V8 Series (100 pages)
  • FCM120 (80 pages)
  • Carefree DOE (3 pages)
  • 20_PV_I (32 pages)
  • BOILERS (48 pages)
  • MPO Series (4 pages)
  • V8H Series (2 pages)
  • 8H (92 pages)
  • SM-6 (28 pages)
  • CHG (4 pages)
  • ALPINE (8 pages)
  • MULTI-PASS (108 pages)
  • C4 SERIES (2 pages)
Home Brands Popular manuals Recently added
Manuals Directory

© 2012–2025, azmanual.top
All rights reserved.