beautypg.com

Battery installation, Spinner installation – E-flite P-40 Warhawk 300 ARF User Manual

Page 9

background image

9

E-flite P-40 Warhawk Assembly Manual

Battery Installation

Required Parts

Assembled airframe Motor battery

1. Slide the motor battery into the fuselage. It

should slide in easily with little force.

2. When you are ready to fly your aircraft, connect

the lead from the battery to the lead from the speed

control. Tuck the leads into the hole or alongside

the battery so the canopy can be installed.

3. Place the canopy back on the fuselage.

Make sure that the leads are tucked into the hole in the

fuselage so that the canopy fits correctly on the model.

If not you could loose your canopy during flight.

Spinner Installation

Required Parts

Fuselage assembly

Spinner

Required Tools

Nut driver: 5mm

Canopy glue

PLEASE NOTE ThAT yOUR SPINNER IS NOT

gLUEd ON FROM ThE FACTORy. IT IS jUST SLId

ON TO ThE PROP ANd NEEdS TO BE REMOvEd

ANd gLUEd ON FOR SAFTEy.

1. Apply a small amount of canopy glue to the nut.

Use a small amount so the spinner can be easily

removed if the propeller requires replacement.

2. Slide the spinner back on the propeller. Allow

the glue to fully cure before flying your model.