beautypg.com

Start up instructions – Watts PWRO4ZRO User Manual

Page 7

background image

7

Start Up Instructions

Warning: To prevent the possibility of electrical shock, clean up

any water on cabinet floor and dry all water from outside of RO

unit.
Step A– Turn on the incoming cold and hot water at the angle stop

valves by turning the knob on the Adapt-A-Valve™ coun-

terclockwise . Check the system for leaks and tighten push

to be further in any fittings as necessary . (Check frequently

over the next 24 hours to ensure no leaks are present) .

Note: If you have connected your RO system to a refrigerator /

ice maker, make sure the ice maker is off (do not allow water to

flow to the ice maker) until flushing is complete and the tank has

been allowed to fill completely. Connection from the RO to the

ice maker system should have an in-line valve installed before

the ice maker so it can easily be closed to prevent water flowing

to the ice maker during start up and periodic maintenance. Your

RO tank must be allowed to fill up fully in order for the ice maker

system to work properly.
Step B – Plug the 24 volt transformer power cord connector into the

RO wire harness connector (labeled Transformer) .

Step C – Plug the transformer into the electrical outlet under the

sink .

Step D – Open the RO faucet and leave it open until water begins to

trickle out (it will come out slowly) .

Step E – After water trickles out of the faucet, close the RO faucet

allowing the storage tank to fill with water . It may take 4 to

6 hours to fill the tank completely depending on the pro-

duction capability of the membrane, local water tempera-

ture and water pressure .

Note: Ensure Ball Valve on the RO storage tank is open.
Note: During the fill period, you may hear water trickling due to

the Reverse Osmosis Process.
Step F – After the Tank has filled, open the RO Faucet to flush the

tank completely to remove carbon particles from final filter .

You will know that the tank is empty when the flow rate

from the RO faucet is down to a trickle . Repeat this step

two more times . The fourth tank can be used for drinking .

Note: Flushing of the tank 3 times is only necessary during the

initial startup and after replacing the membrane.
Important: Your reverse osmosis system contains replaceable

treatment components that are critical for effective containment

reduction. Periodic inspection and following proper system

maintenance is critical for continued performance.