beautypg.com

Model 2850, General commercial pre-installation check list, Installation instructions – Watts Fleck 2850 Brass Valve User Manual

Page 3: Page 3

background image

Printed in U.S.A.

Page 3

MODEL 2850

General Commercial Pre-Installation Check List

WATER PRESSURE: A minimum of 25 pounds of water pressure is required for regeneration valve to operate
effectively.

ELECTRICAL FACILITIES: A continuous 115 volt, 60 Hertz current supply is required. Make certain the current
supply is always hot and cannot be turned off with another switch.

EXISTING PLUMBING: Condition of existing plumbing should be free from lime and iron buildup. Piping that is built up
heavily with lime and/or iron should be replaced. If piping is clogged with iron, a separate iron filter unit should be
installed ahead of the water softener.

LOCATION OF SOFTENER AND DRAIN: The softener should be located close to a drain.

BY-PASS VALVES: Always provide for the installation of a by-pass valve.

CAUTION: Water pressure is not to exceed 120 p.s.i., water temperature is not to exceed 100° F, and the unit cannot
be subjected to freezing conditions.

Installation Instructions

1. Place the softener tank where you want to install the unit making sure the unit is level and on a firm base.

(Maximum 4 feet apart for twin units.)

2. All plumbing should be done in accordance with local plumbing codes. The pipe size for the drain line should be the

same size as the drain line flow control connection. Water meters are to be installed on soft water outlets. Twin
units with (1) one meter shall be installed on common soft water outlet of units.

3. Solder joints near the drain must be done prior to connecting the Drain Line Flow Control fitting. Leave at least 6

between the DLFC and solder joints when soldering when the pipes are connected on the DLFC. Failure to do this
could cause interior damage to the DLFC.

4. Teflon tape is the only sealant to be used on the drain fitting. The drain from twin units may be run through a

common line.

5. Make sure that the floor is clean beneath the salt storage tank and that it is level.

6. Place approximately 1

″ of water above the grid plate (if used) in your salt tank. Salt may be placed in the unit at this

time.

7. Place in by-pass position. Turn on the main water supply. Open a cold soft water tap nearby and let run a few

minutes or until the system is free from foreign material (usually solder) that may have resulted from the installation.

8. Place the by-pass in service position.

9. Manually index the softener control into “service” position and let water flow into the mineral tank. When water flow

stops, close inlet valve, place control in “backwash” position to relieve head of air, then gradually open inlet valve to
purge remaining air in tank. Return control to service position.

10. Electrical: All electrical connections must be connected according to codes. Use electrical conduit if applicable.

Plug into power supply.

This manual is related to the following products: