beautypg.com

Watts M1115 User Manual

Page 6

background image

Size (in)

1-1/4

1-1/2

2

2-1/2

3

4

6

8

10

12

14

16

Maximum Continuous

(GPM)

95

130

210

300

485

800

1850

3100

5000

7000

8400

11100

Maximum Intermittent

(GPM)

119

161

265

390

590

1000

2300

4000

6250

8725

10500 13300

Minimum Continuous

(GPM)

1

1

1

20

30

50

115

200

300

400

500

650

12541 Gulf Freeway

Houston, Texas 77034

(Ph) 713.943.0688

(Fx) 713.944.9445

www.watts.com

M

ustang

s

eries

M115 (Globe)

M1115 (Angle)

• Prior to installation, flush line to remove debris.

• Install valve horizontally “in line” (cover facing up), so flow arrow matches flow through the line.

Avoid

installing valves 6” and larger vertically. Consult factory prior to ordering if installation is other than

described.

• Install inlet and outlet isolation valves.

NOTE: When using butterfly valves, insure disc does not contact

control valve. Damage or improper valve seating may occur.

• Provide adequate clearance for valve servicing and maintenance.

• Install pressure gauges to monitor valve inlet and outlet pressure.

• If installation is subjected to very low flow or potentially static conditions, it is recommended a pressure

relief valve (1/2” minimum) be installed downstream of the Pressure Reducing Valve for additional system

protection.

Proper Automatic Control Valve startup requires bringing the valve into service in a controlled manner. All

adjustments to control pilots and speed controls should be made slowly, allowing the valve to respond and

the system to stabilize.

NOTE: Control Valves should be set-up in a dynamic (flowing) condition for

proper start-up. Provisions for flow must be made to insure proper settings.

1. Close upstream and downstream valves to isolate the valve from line pressure. Release spring

tension on Pressure Reducing Control by turning adjustment screw out (counterclockwise),

decreasing setpoint. Open all Isolation Ball Valves, if so equipped. If valve is fitted with adjustable

speed controls, turn needle(s) in (clockwise) until seated, and return out (counterclockwise) 11/2 to

21/2 turns. These are approximate settings, and should be fine tuned to suit system requirements

after pressure adjustments have been made.

2. Slowly open upstream isolation valve to allow controlled filling of the valve. Vent entrapped air by

carefully loosening control tubing or pipe plug at the highest point possible. If valve is equipped

with a Position Indicator, open Air Bleed Petcock to vent air. Water will be milky in appearance and

will begin to clear as air is vented. Carefully loosen enough cover screws on control pilot(s) to vent

entrapped air. Retighten when water vents clearly.

3. Setting Reducing Control: Slowly open downstream isolation valve. Gradually turn adjustment

screw on the Pressure Reducing Control in (clockwise) to raise downstream pressure. Allow valve

and system to stabilize. Observe inlet and outlet pressure gauges. Continue to adjust as needed,

pausing approximately every 11/2 turns, allowing valve and system to stabilize. Turning adjustment

screw clockwise raises outlet pressure. Turning adjustment screw counterclockwise lowers outlet

pressure. When desired downstream pressure is reached, tighten locknut on adjustment screw.

4. Fine tune Speed Controls to suit system requirements. Adjust Closing Speed Control (if equipped)

clockwise for slower closure, and counterclockwise for faster closure. Adjust Opening Speed Control

(if equipped) clockwise for slower opening, and counterclockwise for faster opening.

Installations

Start-Up

910 Ops & Inst

This manual is related to the following products: