A. All needle valves must be closed on test kit.
B. Open test cock No. 4 and flush test cocks Nos. 1, 2 and 3 on reduced pressure

assembly then close test cock No. 4.

C. Attach hoses as shown. Bleed air from kit, close No. 2 shutoff.

909QT/LF909QT shown

no. 2 shutoff

Bleed Valve A

Bleed Valve B

High

(red)

Bypass

(yellow)

Low

(blue)

Test No. 1 - Check Valve No.2

Purpose: To test check valve No. 2 for tightness against

reverse flow.
Requirements: Valve must be tight against reverse flow under all

pressure differentials.
Step 1 Slowly open the needle valve “A” high side (red) and “C”

bypass (yellow). Keep the “B” low (blue) closed.

Step 2 Open test cock No. 4.
Step 3 Indicated pressure differential will decrease slightly. If

pressure differential continues to decrease (until the vent

opens) the No. 2 check valve is reported as “leaking”.

Test No. 2 - Shutoff Valve No. 2

Purpose: To test shutoff valve No. 2 for tightness.
Step 1 After passing Test No. 1, continue to test No. 2 by

closing test cock No. 2.

Step 2 The indicated pressure differential will decrease slightly.

If pressure differential continues to decrease

(approaching “zero”), the No. 2 shutoff valve is reported

to be “leaking”.

NOTICE

A leaking No. 2 shutoff will give a

false reading in tests No. 3 and 4.

Test No. 3 - To Test No. 1 Check Valve

Purpose: To test check valve No. 1 for tightness.
Requirements: Valve must be tight against reverse flow under all

pressure differentials.
Step 1 Close needle valve “A” high side (red) and open test

cock No. 2

Step 2 Close test cock No. 4. Disconnect bypass hose (yellow)

at test cock No. 4.

Step 3 Open needle valve “B” low (blue) and “C” bypass

(yellow), bleeding to atmosphere, then closing needle

valve “B” (blue) restores the system to a normal

static condition.

Step 4 Observe the pressure differential gauge. If there is a

decrease in the indicated value, the No. 1 check valve is

reported as “leaking”.

Test No. 4 - Pressure Differential Relief Valve

Purpose: To test operation of pressure differential

relief valve.
Requirements: The pressure differential relief valve must operate

to maintain the “zone” between the two check valves at least 2psi

less than the supply pressure.
Step 1 Close needle valve “C” bypass (yellow).
Step 2 Open needle valve “A” high side (red).
Step 3 Open needle valve “B” low (blue) very slowly until the

differential gauge needle starts to drop.

Step 4 Hold the valve at this position and observe the gauge

reading at the moment the first discharge is noted from

the relief valve. Record this as the opening differential

pressure of the relief valve.

NOTICE

It is important that the differential gauge needle drops slowly.
Step 5 Close test cocks Nos. 2 and 3. Remove hose from test

cocks Nos. 2 and 3.

Step 6 Use bypass hose (yellow) to relieve pressure from test

kit by opening needle valve “A”, “B” and “C” and bleed

valves “A” and “B”.

Step 7 Remove all test equipment and open No. 2 shutoff

valve of the device.

4

CAUTION

!

To prevent freezing, hold Test Kit vertically to drain differential

gauge and hoses prior to placing in case.
For additional testing information, refer to IS-TK-DP/DL,

IS-TK-9A, IS-TK-99E or IS-TK-99D.

Test Procedure for Reduced Pressure Assembly