beautypg.com

Lassic, Eries – Watts F1110-14 User Manual

Page 5

background image


Globe


Angle

8550 Hansen Road

Houston, Texas 77075

(Ph) 713.943.0688

(Fx) 713.944.9445

www.watts.com

C

laSSiC

S

erieS

F110-14 (Globe)

F1110-14 (Angle)

Installations

Start-Up

Prior to installation, flush line to remove debris.

Install valve horizontally “in line” (cover facing UP), so flow arrow matches flow through the line. Avoid installing

valves 6” and larger vertically. Consult factory prior to ordering if installation is other than described.

Install inlet and outlet isolation valves. NOTE: When using butterfly valves, insure disc does not contact control

valve. Damage or improper valve seating may occur.

Provide adequate clearance for valve servicing and maintenance.

Install pressure gauge to monitor valve inlet pressure.

Provide adequate drain for cover chamber discharge. Consult “Valve Cover Capacity” chart on appropriate main

valve Engineering Bulletin.

If On-Off Float Pilot is remotely mounted it should be field connected with 3/8” minimum copper tubing in

accordance with factory piping schematic.

Float Pilot, Rods, and Ball should be mounted in a field installed “stilling well” for protection against surface

turbulence and interference.

Additional 12” Float Rods available. Consult Factory.

Proper Automatic Control Valve start‑up requires bringing the valve into service in a controlled manner. All adjustments

to control pilots and speed controls should be made slowly, allowing the valve to respond and the system to stabilize.

NOTE: Control Valves should be set‑up in a dynamic (flowing) condition for proper start‑up. Provisions for flow

must be made to insure proper settings.

If Float Control is remote mounted, field installed control lines should be 3/8” minimum copper tubing for

distances no greater than 10 feet. For greater distances use 1/2” minimum copper tubing or pipe.

Remote mount – without Accelerator (4” and smaller):

Port 1 = Supply Pressure

Port C = Valve Cover

Port 2 = Atmosphere

Remote Mount – with Accelerator (6” and larger): Port 1 = Atmosphere

Port C = Accelerator Cover

Port 2 = Supply

Close upstream and downstream valves to isolate the valve from line pressure. Open all Isolation Ball Valves,

1.

if so equipped. If valve is fitted with adjustable speed controls, turn needle(s) in (clockwise) until seated, and

return out (counterclockwise) 1‑1/2 to 2‑1/2 turns. These are approximate settings, and should be fine tuned to

suit system requirements after level adjustments have been made.

Slowly open upstream isolation valve to allow controlled filling of the valve. Vent entrapped air by carefully

2.

loosening control tubing or pipe plug at the highest point possible. If valve is equipped with a Position Indicator,

open Air Bleed Petcock to vent air. Water will be milky in appearance and will begin to clear as air is vented.

Re‑tighten when water vents clearly.

Setting Float Control:

3.

Install desired number of Float Rods and Low and High Level Stop Collars (less Float).

Manually position Float Control to the center point in its travel and balance by positioning Counterweight “in” or

“out” until Float Control holds in position. Proper balance is achieved when Float Control moves to the “down/

on” or “up/off” position with minimal force or drag. The position of Counterweight on the Counterweight Rod will

vary based upon the number and material of Float Rods being used. Install Float.

Position Low and High Level Stop Collars on Float Rods to match desired valve opening and closing levels.

4.

Slowly open downstream isolation valve.

Fine tune Speed Controls (if equipped) to suit system requirements. Adjust Closing Speed Control clockwise

5.

for slower closure and counterclockwise for faster closure. Adjust Opening Speed Control clockwise for slower

opening and counterclockwise for faster opening.

910 Ops & Inst

This manual is related to the following products: