beautypg.com

Metrohm 887 Professional UV/VIS Detector User Manual

Page 26

background image

3.5 Installing the flow-through cell

■■■■■■■■■■■■■■■■■■■■■■

18

■■■■■■■■

887 Professional UV/VIS Detector

Installing the flow-through cell

1

2

3

4

1 Loosen knurled screws (5-3) and remove.

2 Remove covering plate (5-2).

3 Insert the flow-through cell (6.2839.130) aligning the opening at the

top right corner to the cylinder screw (5-4) on the cell block.

4 Tighten knurled screws again.

Note

In order to fix the flow-through cell in the correct position, both
knurled screws must be tightened symmetrically and with constant
force.

Any tilting, twisting or canting of the flow-through cell influences
the light incidence and thus the measuring results.