3 installation, 1 preparing the ultrafiltration cell, Preparing the ultrafiltration cell – Metrohm Inline-Ultrafiltration User Manual
Page 12

3.1 Preparing the ultrafiltration cell
■■■■■■■■■■■■■■■■■■■■■■
6
■■■■■■■■
IC equipment: Inline-Ultrafiltration
3 Installation
This chapter describes how to assemble the ultrafiltration cell, how to fas-
ten the ultrafiltration cell to the Sample Processor or in the ion chromato-
graph and how to connect the ultrafiltration cell to the peristaltic pump
and the injection valve.
Depending on the device combination, the ultrafiltration cell may be
placed at different locations. Please observe the following recommenda-
tions:
Devices
Peristaltic pump
Ultrafiltration cell
Sample Processor with
peristaltic pump and ion
chromatograph
on the Sample Processor
on the Sample Processor
Only ion chromatograph,
type Prep 1
on the ion chromatograph
on the ion chromatograph
Only ion chromatograph
with peristaltic pump
on the ion chromatograph
in the detector chamber of
the ion chromatograph
with cell holder
(6.2057.120)
3.1
Preparing the ultrafiltration cell
You have to insert a filtration membrane (6.2714.020) before you can
insert the ultrafiltration cell.