4 setting up the instrument, 1 packaging, 2 checks – Metrohm 850 Professional IC Cation - Prep 2 User Manual
Page 26: 3 location, Setting up the instrument, Packaging, Checks, Location, Tration column (3-13) at the injection valve (3-7), 7) is switched to
2.4 Setting up the instrument
■■■■■■■■■■■■■■■■■■■■■■
16
■■■■■■■■
850 Professional IC – Cation – Prep 2
3
High pressure pump
See Chapter 2.10.
4
Purge valve
See Chapter 2.10.1.
5
Inline filter
See Chapter 2.11.
6
Pulsation damper
See Chapter 2.12.
7
Injection valve
See Chapter 2.15.
8
Separation column
See Chapter 2.20.
When a guard column (see Chapter 2.19,
page 57) is used, it is installed between
injection valve and separation column.
9
Detector
See Chapter 2.17.
10 Eluent output
Connection to the waste container.
11 Sample input
Connection to the sample vessel.
12 Injection valve
For sample preparation. See Chapter 2.15.
13 Preconcentration column
For sample preconcentration.
14 Sample output
15 Sample degasser
See Chapter 2.13. Use optional.
16 Standard solution inlet
Connection to the standard solution con-
tainer.
17 Peristaltic pump
Pumps the standard solution. See Chapter
2.14.
18 Standard solution outlet
Connection to the waste container.
2.4
Setting up the instrument
2.4.1
Packaging
The instrument is supplied in highly protective special packaging together
with the separately packed accessories. Keep this packaging, as only this
ensures safe transportation of the instrument.
2.4.2
Checks
Immediately after receipt, check whether the shipment has arrived com-
plete and without damage by comparing it with the delivery note.
2.4.3
Location
The instrument has been developed for operation indoors and may not be
used in explosive environments.
Place the instrument in a location of the laboratory which is suitable for
operation, free of vibrations, protected from corrosive atmosphere, and
contamination by chemicals.
The instrument should be protected against excessive temperature fluctu-
ations and direct sunlight.