beautypg.com

3 installation diagram, Installation diagram – Metrohm 850 Professional IC Anion MSM-HC MCS Prep 2 User Manual

Page 26

background image

3.3 Installation diagram

■■■■■■■■■■■■■■■■■■■■■■

16

■■■■■■■■

850 Professional IC –Anion – MSM-HC – MCS – Prep 2

ing to the installation diagram for the required inline sample prepara-
tion:

Matrix elimination with transfer (see "Matrix elimination with
transfer procedure", page 18)

Standard addition with preconcentration (see "Standard
addition with preconcentration", page 20)

3.3

Installation diagram

The following installation diagram shows the schematics of the front of
the instrument after installation is complete but still without sample path
and inline sample preparation. Many capillaries are already installed at the
time the instrument is delivered; these capillaries are not numbered in the
diagram. Numbered capillaries must be connected at the time of installa-
tion.