3 installation diagram, Installation diagram – Metrohm 881 Compact IC pro – Anion – MCS User Manual
Page 24

3.3 Installation diagram
■■■■■■■■■■■■■■■■■■■■■■
14
■■■■■■■■
881 Compact IC pro – Anion – MCS
■
Connect the separation column (see Chapter 3.21, page 60)
– Connect the inlet oft the separation column either with the
end of the column input capillary using a PEEK pressures
screw (6.2744.070).
or
Connect the inlet of the separation column with the guard
column (if used) (see leaflet to the separation column)
– Connect the MSM capillary labeled with in with the output
of the separation column using a PEEK pressure screw
(6.2744.070).
■
Hang separation column with chip in the column holder of the
instrument.
11 Conditioning the instrument
The instrument is now ready for measuring samples.
3.3
Installation diagram
The following installation diagram shows the schematics of the front of
the instrument after installation has been completed with the connected
sample degasser. Many capillaries are already installed at the time the
instrument is delivered; these capillaries are not numbered in the diagram.
Numbered capillaries must be connected at the time of installation.