3 installation, 1 about this chapter, 2 initial installation – Metrohm 881 Compact IC pro – Anion – MCS User Manual
Page 20: About this chapter, Initial installation

3.1 About this chapter
■■■■■■■■■■■■■■■■■■■■■■
10
■■■■■■■■
881 Compact IC pro – Anion – MCS
3 Installation
3.1
About this chapter
The Installation chapter contains
■
this overview.
■
a brief set of instructions for the initial installation of the 881 Compact
IC pro – Anion – MCS. At each step you will find cross-references to
more detailed installation instructions for individual components,
should you require such aids.
■
an installation diagram (see Chapter 3.3, page 14), showing a com-
pletely installed 881 Compact IC pro – Anion – MCS.
■
several chapters with detailed installation instructions for all compo-
nents, including those that are already installed at the time the instru-
ment is delivered.
3.2
Initial installation
Note
A number of the capillaries is already connected at the time the instru-
ment is delivered.
The following work steps must still be carried out:
881 Compact IC proInstalling – Anion – MCS
1 Setting up the instrument
2 Installations on the rear of the instrument
■
Place the detector in the instrument and connect it (see manual
of the detector).
■
Remove all of the transport locking screws with the 4 mm hexa-
gon key (6.2621.030) and keep them in a safe place.
■
Connect the leak sensor (see Chapter 3.6.2, page 20).
■
Connect the drainage tubings (see Chapter 3.6.3, page 21).