beautypg.com

15 initial start-up – Metrohm 930 Compact IC Flex ChS/PP User Manual

Page 52

background image

3.15 Initial start-up

■■■■■■■■■■■■■■■■■■■■■■

44

■■■■■■■■

930 Compact IC Flex ChS/PP (2.930.1300)

2 Switching on the instrument

Switch on the instrument using the power switch.

After being switched on, the LED on the front of the instrument
flashes. The instrument conducts a system test and establishes a con-
nection to the software. Once the system test is complete and the
connection to the software has been established, the LED lights up
continuously.

3.15

Initial start-up

Even before the guard column and separation column are installed, the
entire system has to be completely rinsed with eluent for the first time.

Rinsing the IC system

CAUTION

The guard column and separation column must not be installed for the
initial start-up.

Make sure that a coupling (6.2744.040) is being used instead of the
columns.

1 Preparing the software

Start the MagIC Net computer program.

Open the Equilibration tab in MagIC Net: Work-
place

Run Equilibration.

Select (or create) a suitable method.
Also see: MagIC Net tutorial and online help.

2 Preparing the instrument

Ensure that the eluent aspiration tubing is immersed in the eluent
and there is enough eluent in the eluent bottle.