beautypg.com

Rfi prep – Bully Dog 54100 Rapid Flow Induction Cold Air Intake User Manual

Page 15

background image

14

6. The final step in preparing the RFI for installation is to insert the RFI tube into the RFI
enclosure. Insert the RFI tube into the hole on the RFI base and then press inward until the
tube snaps into place. If the tube is properly in place then all of the interference snap fits
will be on the inside of the RFI base and the tube will actually rotate fairly easily.

RFI Prep