Introduction – Bally Refrigerated Boxes 1000 Northwind Blast Chiller User Manual
Page 2
![background image](/manuals/582249/2/background.png)
2
Introduction
READ ENTIRE MANUAL BEFORE BEGINNING INSTALLATION!
•
There are 9 steps to the installation process. This manual gives you a correct sequence to
follow as you prepare for and carry out installation.
•
Prior to the day you make the installation, be sure to review the tool list and parts list, and
the illustrated plan so that you can complete the installation in a reasonable time without
any problems.
•
There is also a precise wiring diagram included for any complication and step-by-step
instructions to make the job that much easier.
•
No manual can anticipate every field situation, but if there are any questions not answered
here, please feel free to call the Bally Northwind help desk at 800-242-2559. Our staff of
troubleshooters will do their best to assist you.